DIGITAL RAIL
Future melody
in the here and now.
Digital Rail
And since we’re talking about the future, we’ve also implemented a project with a future melody in the here and now.
For the internal DB trade fair 2020 in Hamburg, we
fully wrapped 3 wagons for the Digital Rail project.
The Digital Rail combines artificial intelligence and automated driving – all without building a single new track.
Train Branding
Complexity in detail:
Fire protection tests were coordinated. Test specimens were finalized by us.
Many meetings were involved – graphic meetings, in-house discussions, and various on-site appointments, including inspections and coordination. Each wagon was individually approved in stages.
First the floor, then the walls, then the ceilings.
The interior side walls were also covered.
In addition to the ceilings, all partition walls and windows were covered with glass decoration film and/or privacy film. The tables have a table top covered with furniture film.
Duration of use material properties:
Film inside outside for 3 wagons
White print
Production of 740 m² of film
Production type: Digital print film
Installation duration: 12 days
Scope of wrapping:
Exterior: fully wrapped up to the roof including all doors (barrier-friendly)
Interior: Floor film, anti-slip film